UWMLSC > Beowulf Systems > Medusa
   UPS Testing

Testing Results

Tests completed on 4-15-04

For all of the following tests the nodes are set to shutdown after 2 mins.

Test 1
Long power failure with idle nodes
The test effects 20 nodes

  • Clone nodes s001-s040
  • Pull ups power cable for nodes s001-s020
  • After all nodes shutdown plug ups cable back in.
  • Etherwake nodes. Make sure they all come back up.
Proper Result: All 20 nodes should shutdown cleanly and etherwake
Result: PASSED

3min 14sec for halt