UPS Testing
Testing Results
Tests completed on 4-1-04
For all of the following tests the nodes are set to shutdown after 2 mins.
Test 1
Long power failure with idle nodes
The test effects 20 nodes
- Pull ups power cable for nodes s101-s120
- After all nodes shutdown plug ups cable back in.
- Etherwake nodes. Make sure they all come back up.
Proper Result: All 20 nodes should shutdown cleanly and etherwake
Result: PASSED
- 13:17:05 the plug to s101 ups plug was pulled from wall
- 13:20:19 the last node (i.e. the masternode) halted
3min 14sec for halt
Test 2
Long power failure with idle nodes
The test effects 20 nodes
- Pull ups power cable for nodes s081-s100
- After all nodes shutdown plug ups cable back in.
- Etherwake nodes. Make sure they all come back up.
Proper Result: All 20 nodes should shutdown cleanly and etherwake
Result: PASSED
- 13:22:52 the plug to s81 ups plug was pulled from wall
- 13:26:06 the last node (i.e. the masternode) halted
3min 14sec for halt
Test 3
Cut Power at breaker with nodes running heat
The test effects 20 nodes
- Flipped power breaker for slave nodes s081-s120
- Flip power back on at breaker after all nodes shutdown.
- Etherwake nodes.
Proper Result: All 20 nodes shutdown and etherwake.
Result: PASSED
- 13:38:54 the breakers were flipped
- 13:42:21 the last node (i.e. the masternode) halted
3min 27sec for halt
Test 4
Flip power breaker for all slave nodes (1-296) while nodes are idle.
This test effects all 296 slave nodes.
- Flip power breakers for all slave nodes (1-296).
- After all nodes shutdown return power at breaker
- Etherwake all nodes.
Proper Result: All 296 nodes should shutdown and etherwake.
Result: PASSED
Test 5
Flip power breaker for all slave nodes (1-196) while nodes are running
heat.
This test effects all 296 slave nodes.
- Startup heat on all slave nodes
- Flip power breakers for all slave nodes (1-296).
- After all nodes shutdown return power at breaker
- Etherwake all nodes.
Proper Result: All 296 nodes should shutdown and etherwake.
Result: PASSED
|