LSC Data Analysis Software Working Groups

Navigation

DASWG
LSC
LIGO


DASWG LAL Doxygen

Docs

How-to
Minutes
Technical
Software Docs

Download

Browse CVS
Repositories

Participate

Change Control Board
Edit these pages
Sub-committees
Mailing List
Telecon

Projects

DMT
geopp
Glue
LAL Home Page
LALApps Home Page
LDAS
LDG Client/Server
LDM
LDR
LIGOtools
MatApps
MDS4
Metaio
Onasys
Online
OSG-LIGO
pyLAL

Agenda and Minutes, 22 Feb 2006

Agenda: Wed 22 Feb 2006 10:30 PDT

  

Minutes



Attendance:

  John Whelan
  Ed Maros
  Patrick Brady
  Jolien Creighton
  Duncan Brown
  Shourov Chatterji
  Stuart Anderson
  Keith Thorne
  Peter Shawhan
  Kipp Cannon
  Adam Mercer


Calibration Frame Stuff:

  Jolien has redefined the LALFrDetectors structure.  Patrick asked
  how to get things moving on the downstream end.  Jolien said he
  would like an XLAL program to read in the text files from the
  Calibration team.  (Patrick might be able to help with that.)

  Jolien had circulated sample frames.  Stuart found that the leap
  seconds was not correctly populated.  Jolien expects to have code
  available next week.

  Patrick summarised the information in the calibration team minutes
  from 17 Feb.

  http://www.ligo-la.caltech.edu/~irish/Work/Calibration/MINUTES/

  Patrick also mentioned the punchlist that is being developed by the
  calibration team.  One of the checks will include a point
  calibration for comparison with any code that uses the reference
  functions and factors to calibrate data.


DMT: 

  Rpms have been produce for offline dmt and for FrameCPP
  (preliminary). Many thanks to Junwei and Ed. Testing in progress.
  Patrick asked what this meant at the meeting,   no information was
  available. 

  Updates have been made to BicoMon (fix crash from using
  uninitialized sample rate) and LockLoss (eliminate unneeded
  low-pass).

  ASC overflows segments now produced online.

  Duncan and Kipp have been working on a genericMon which can display
  event information in the control room.  Kipp has xml code to
  translate from inspiral and bursts to generic monitor.


Glue:

  He has an automated dump of the data quality information and posting
  to the web site.  This is now moving forward.

  Kipp has added and updated ligo-lightweigth library code. 
  

LDG and PyGlobus:

  there is a bug report in against 64bit Opteron with the VDT people.
  They say they will try to support it soon,  but Kevin thinks it will
  take them a number of weeks to get things going.

  Stuart will persist with ssh kludge for another week or two. 

  

Calibration:

  One file with factors time series and reference functions in stat
  data structures.

  Long discussion of what to do.  The conclusion is to have Jolien
  produce a couple of frames with the format that he is proposing and
  have some people test them.  We will try to have this issue
  concluded next wednesday with an implemtation.


DMT:

  No report.
  
  Stuart asked about the rpms.  Junwei will have an rpm of dol soon. 
  Patrick has root available in lscsoft and will do a test against
  this once the next rpm is available.   Ed will try to build an rpm
  of libframecpp.


Glue:  

  Has a cron job to extract segment database and put on a web site.  

  Discussion of problems of LDG on Opteron boxes.  Kevin Flasch is
  trying to find a solution.   Junwei has a prototype LDG 4.0,  but
  nobody has tested the server release.

  Patrick will try to install the client on the Opterons at Caltech
  and e-mail people with the results.


LAL:
  
  Move to have LAL build against latest fftw on fc4.  Will test
  against a source build of fftw.


LDAS:

  Building of framcpp rpms,  64 bit port and other PRs


LDR:

  Fixed bug in dataFind server has been fixed by Kevin Flasch.   This
  is small,  so people will copy the file.  There have been no issues
  at UWM;  he thinks that people can move it onto their systems. 

  There was an issue where results were not being ordered.  Now they
  are.  


LIGOTools:

  The new version of segwizard was released.  The new version of
  metaio library on 64bit machines.  readMeta are not working on these
  machines.  Peter has it now compiling on 64 bit properlies. 

  Peter and Stuart discussed the issue of rsyncing libraries and
  software and whether there is a need for a separate 64bit
  installation.  

  frgetvect modifications have been made by Shourov and he will put
  into LIGOTools and will forward it to Benoit.  Jolien mentioned that
  Benoit will release an update very soon and it would be really nice
  to get this into the release. 


MatApps:

  They are continuing to track 64 builds:  the stochastic group has
  managed to do this,  but Keith has not gotten to get things to work
  at CIT.

  Shourov has asked about differences in 32 bit code versus 64 bit on
  64 bit machines.  Kipp mentioned that he has seen really big
  increases.

  
Onasys:

  Kipp has added automatic job removal to the daemon.  He will test
  and then release it when he is sure it is working.  


AOB:

  The upgrade at LHO has started due to unforseen circumstances.  

Meeting adjourned at 13:30