Attendance:
Duncan, Patrick, Xavier, Jolien, Kent, Stuart, Philip, Peter,
Julien, John, Joe,
Action:
None.
Agenda:
LDAS 0.5.0 has not entered code freeze yet. Ed thinks this
will take at least a week and a half. They will play it by
ear and plan for code freeze until next week and half.
Changes for LALWrapper has been changed on the ldas-dev
system. These unstructured data types have now been sent all
the way through. 10 October roughly for release of 0.5.0.
Stochastic group are not ready to make this launch window.
They may re-evaluate based on postponement of code freeze.
There is still significant discussion going on in the group
before making a decision.
Calibration code is being worked on by Jolien and Patrick.
DSO's: power is being updated and will have search summary
table added soon. Inspiral has search summary and has no
known problems. Stochastic uses search summary and they do
not know of any problems at this time. TFClusters uses
search summary table output; nothing has changed since E7.
The seg-faults arose from running on bad-unlocked data.
Dont't know about slope. No activity on FCT.
FCT: Rick Jenet will be arriving in the next few weeks and
should be working on the FCT code. Maybe.
Upgrade to RH7.3: they still hope they can get there, but
have run into problems.
Data availability: about 5 hours of S1 data at beginning is
not there. At UWM we will have all the RDS data on UWM system
early next week. Status of ALLEGRO data at UWM: Duncan says
that it should be visible.
Next Meeting:
|