LSC-Virgo Burst Analysis Working Group

Navigation

Burst Group Home
Wiki
ExtTrig Home
CBC Group Home
LSC, LIGO, Virgo

Documents

'How-to' docs
Agendas/minutes
[2008, 2007, earlier]
Talks/Posters [pre-wiki]
Papers
Paper plans
White papers
ViewCVS

Investigations

Analysis projects
Old notebook [General, S2, S3, S4, S5]
Virgo workarea
External collabs

Review

Main review page
Telecons

Review Committee Meeting Monday 11 February 2008 08:00 Pacific / 11:00 Eastern

Minutes: Monday 11 February 2008 08:00 Pacific / 11:00 Eastern

Agenda and Contact Info

Agenda

  1. Announcements
  2. Reports from Burst Review Teams
  3. Review of BurstMDC Simulation
    • Updated BurstMDC code [ HTML ]
    • Updated GravEn code [ HTML ]
  4. A.O.B.

Contact Info

InterCall telecon service:
   Phone: 1-866-380-5536, participant code: 435 672 9587 #
   International callers ++1-816-249-4731 with same code
   International access numbers (~10 cents/min surcharge for LIGO Lab):
      Paris 017 080 7156 ;
      Lyon 042 603 0036 ;
      Germany toll-free 0800 182 1591 ;
      Berlin 030 726 167 371 ;
      Rome 00645 217 080 ;
      UK toll-free 0808 234 7914 ;
      London 0203 107 0293
   Handy participant command:  Press *6 ["*M"] to mute, #6 to unmute

Minutes

  1. Announcements: None
  2. Reports from Burst Review Teams
    • Norma: BN-CP review is going smoothly.
    • Patrick Sutton: LIGO-GEO search is nearing completion. This week will draw up a list of final checks.
    • Discussion of whether to parallelize cWB review to handle the S5-1yr and the S5-SGR searches. Patrick thinks that it would be inefficient to have two groups reviewing very similar thing. Brian thinks that the S5-SGR is a significant new review that should be done in parallel. Burst group priority is S5-1yr but real concern is that the review of this search should not be pushed into the fall. If S5-SGR could be completed before that then it may be OK to do things in sequence. Need to resolve this over the week.
  3. Review of BurstMDC Simulation
    • Request from the ExtTrig group to review the ExtTrigBurstMDC code after the BurstMDC review is complete.
    • Looked at Patrick Sutton's diagrams of the reviewed BurstBDC routines. Patrick will put the PPT into CVS and Keith will put boxes around the code that still needs to be reviewed.
    • Updated GravEn code [ HTML ]
      • Reviewed changes to randomangle. New version is correct.
      • Reviewed changes to getdetrate. Not happy with using "V2" as "Virgo channel at 16384 Hz" because: (i) Previous confusion about V2; (ii) Possibility that V2 may mean something else in the future; (iii) Possibility that various sample rates of other IFOs would be needed and such a scheme is not extensible. However, solution seems to be a working one for now.
  4. A.O.B.
    • Next week we will start doing the X-Pipeline reviews following the Burst Review Committee meeting. (Only the X-Pipeline Review team will need to be at these meetings of course -- this is not an extension of this meeting.)
$Id: minutes-2008-02-11.html,v 1.2 2008/02/11 17:50:47 jolien Exp $