LSC-Virgo Burst Analysis Working Group

Navigation

Burst Group Home
Wiki
ExtTrig Home
CBC Group Home
LSC, LIGO, Virgo

Documents

'How-to' docs
Agendas/minutes
[2008, 2007, earlier]
Talks/Posters [pre-wiki]
Papers
Paper plans
White papers
ViewCVS

Investigations

Analysis projects
Old notebook [General, S2, S3, S4, S5]
Virgo workarea
External collabs

Review

Main review page
Telecons

Review Committee Meeting Monday July 7 2008 08:00 Pacific / 11:00 Eastern

Minutes: Monday July 7 2008 08:00 Pacific / 11:00 Eastern

Agenda and Contact Info

Agenda

  1. Announcements
  2. Update on status of S5 1st Year Burst Search Paper [ HTML ]
  3. Reports from Burst Review Teams
  4. Review of BurstMDC Simulation
    • BurstMDC Bulletin Board [ HTML ]
    • Got to line 322 of graven.m
  5. A.O.B.

Contact Info

InterCall telecon service:
   Phone: 1-866-380-5536, participant code: 435 672 9587 #
   International callers ++1-816-249-4731 with same code
   International access numbers (~10 cents/min surcharge for LIGO Lab):
      Paris 017 080 7156 ;
      Lyon 042 603 0036 ;
      Germany toll-free 0800 182 1591 ;
      Berlin 030 726 167 371 ;
      Rome 00645 217 080 ;
      UK toll-free 0808 234 7914 ;
      London 0203 107 0293
   Handy participant command:  Press *6 ["*M"] to mute, #6 to unmute

Minutes

  1. Announcements
    • Not sure what to do with time for this meeting. Perhaps we need a second meeting for 1st year S5 review.
  2. Update on status of S5 1st Year Burst Search Paper [ HTML ]
    • Expecting to have an updated draft 2-3 wks from last week's burst group meeting.
    • cWB: applied dQ flags. Done. Review on-going. Work divided. Beginning to fill in blank spots in document. Working on paper. Within 2 weeks will have more structure.
    • BlockNormal: Keith will provide plots; update paper to newest algorithm (2 wks). Review: Badri will take Michele's outline and fill it in. Aiming to complete review by end of July. Doing Gaussian MDCs.
  3. Reports from Burst Review Teams
  4. Review of BurstMDC Simulation
    • Discussion of MDC sets to generate:
      • Current proposal: Reduce from 5 sets to 3. Reduction of number of scale factors by a factor of 2 in two of the MDC sets. Number of sets is: 5 * 23 changed to 2 * 12 + 1 * 23.
      • Can do better than this, but it will start to change the efficiency calculation procedure. Is it worthwhile?
      • Reduce waveform morphologies? Sergey thinks we should not reduce morphologies otherwise ETGs may be tuned for SGs.
      • Keith thinks that using a continuous set of amplitudes would be too radical if we want to have results by Amsterdam. Would have to write new fitting scripts.
      • Full MDC set would probably take ~2 wks to process with the propsed MDC set.
    • Review of graven.m
      • Comment below line 322 is wrong, but code is correct: detStartGps is lower edge of first sample. When talking about central times, the time is half a sample later. E.g., if timeseries has a 1 at sample 0 and 0 at all other samples then this is equivalent to a square with height 1/dt for time t=0 and t=dt where dt is the sample interval. This has a middle at sample 0.5.
      • Got to line 408.
  5. A.O.B.
$Id: minutes-2008-07-07.html,v 1.2 2008/07/07 16:01:30 jolien Exp $