LSC-Virgo Burst Analysis Working Group

Navigation

Burst Group Home
Wiki
ExtTrig Home
CBC Group Home
LSC, LIGO, Virgo

Documents

'How-to' docs
Agendas/minutes
[2008, 2007, earlier]
Talks/Posters [pre-wiki]
Papers
Paper plans
White papers
ViewCVS

Investigations

Analysis projects
Old notebook [General, S2, S3, S4, S5]
Virgo workarea
External collabs

Review

Main review page
Telecons

Review Committee Meeting Monday January 5 2009 08:00 Pacific / 11:00 Eastern

Minutes: Monday January 5 2009 08:00 Pacific / 11:00 Eastern

Agenda and Contact Info

Agenda

  1. Announcements
  2. Any business for APS?
  3. A.O.B.

Contact Info

InterCall telecon service:
Phone: 1-866-380-5536, participant code: 435 672 9587 #
International callers ++1-816-249-4731 with same code
International access numbers [ HTML ]
Handy participant command: Press *6 ["*M"] to mute, #6 to unmute

Minutes

  1. Announcements
    • European Astronomical Society meeting near London just before APS meeting... would like to have results for this too.
    • Things need to be done by March LSC meeting then so that the papers can be on the arxiv before then.
  2. Any business for APS?
    • Discussion of what needs to be done before APS (really March meeting).
    • S5y1 HF+LF all-sky results should be out.
    • S5y2/VSR1 all-sky needs to be reviewed actively to have results for presentation at March LSC meeting.
    • S5 y1+y2/VSR1 talk split into HF and LF.
    • GRB -- review summit next week.
    • Vetos talk. (Normally reviewed by detchar.)
    • Detection confidence talk. Perhaps like Lindy's talk in Amsterdam. Depends on whether equinox is a blind injection or not.
    • Sky localization talk. Coordinate with CBC group. Data analysis talk based on results from S5. Perhaps a section in the y2 paper, perhaps a stand-alone paper. Jolien is worried about prospect of reviewing another paper by APS meeting....
  3. A.O.B.
    • Read S5y1 low-frequency paper. Still needs much work.
    • Discussion of the paper. Jolien thinks it is too long. Erik thinks it can be long, but should be coherent.
    • Committee is willing to give detailed comments but only if authors think that the paper is in a state for us to occupy ourselves with this.
    • I am assuming that Brennan knows what to do with the calibration and is doing it.
    • Status of S4 cosmic string... don't know if they will submit abstract to APS.
$Id: minutes-2009-01-05.html,v 1.2 2009/01/05 16:50:13 jolien Exp $