LSC-Virgo Burst Analysis Working Group

Navigation

Burst Group Home
Wiki
ExtTrig Home
CBC Group Home
LSC, LIGO, Virgo

Documents

'How-to' docs
Agendas/minutes
[2008, 2007, earlier]
Talks/Posters [pre-wiki]
Papers
Paper plans
White papers
ViewCVS

Investigations

Analysis projects
Old notebook [General, S2, S3, S4, S5]
Virgo workarea
External collabs

Review

Main review page
Telecons

X-Pipeline Review Meeting Monday 01 Dec 2008 09:00 Pacific / 12:00 Eastern

Agenda: Monday 01 Dec 2008 09:00 Pacific / 12:00 Eastern

  1. Announcements:
    • Announcements: H1H2 standard likelihood bug fixed; affected GRBs rerun.
    • Jolien's "checklist" added to review summary page.
  2. Code review: Reviewing likelihood types in lines 706--1192 of xtimefrequencymap.

Minutes:

Attendance: Patrick Sutton, Jolien Creighton, Gareth, Xavi
  1. H1H2 likelihood corrected and rerun.
  2. Before opening box todos: sort out injection issue, comprehensive calibration studies, go over xcondition again.
  3. Concern about null-stream cut. Residual signal if calibration is not correct. Cut is in comparison to not-null stream energy. Looking for significant amount of cancelation rather than complete cancelation. However, phase errors (e.g., time error ~1ms) would put one signal out of phase with other signal. V3 calibration: a few degrees (5 degrees) at a few kHz.
  4. Would like MDC study with miscalibrated injections. Don't need high accuracy estimates (large number of injections) per GRB but would be nice to have it for all GRBs because of the different antenna patterns. Can do this within the xpipeline injection engine.
  5. Try things out with one GRB.
  6. Population study: binomial test as Isabel did. Is it better to to use a single loudest event, loudest 10 events, ?
  7. Need a population plan.
  8. Question about review summit.
$Id: minutes-2008-12-01.html,v 1.3 2008/12/01 18:04:30 jolien Exp $