LSC-Virgo Burst Analysis Working Group

Navigation

Burst Group Home
Wiki
ExtTrig Home
CBC Group Home
LSC, LIGO, Virgo

Documents

'How-to' docs
Agendas/minutes
[2008, 2007, earlier]
Talks/Posters [pre-wiki]
Papers
Paper plans
White papers
ViewCVS

Investigations

Analysis projects
Old notebook [General, S2, S3, S4, S5]
Virgo workarea
External collabs

Review

Main review page
Telecons

X-Pipeline Review Meeting Monday 27 April 2009 09:00 Pacific / 12:00 Eastern

Agenda: Monday 27 April 2009 09:00 Pacific / 12:00 Eastern

  1. Sigmoid checking of open-box results (Gareth)
  2. Calibration test with X-Pipeline (Patrick)
  3. Begin walking through results webpages [twiki ].

Minutes:

Attendance: Patrick, Gareth, Xavier, Jolien
  1. Sigmoid checking of open-box results (Gareth)
    • Going through all of the webpages looking for bad efficiency plots.
    • Concrete proposal: do a linear fit between the point with e_< < 0.9 and the point with e_> > 0.9. This is conservative. If e_< is less than 0.5 then this is not appropriate: either do finer set of injections, or choose e_> as the conservative estimate.
  2. Calibration test with X-Pipeline (Patrick)
    • Nothing new to report here.
  3. Begin walking through results webpages.
    • Looked at GRB070809 results [ HTML ].
    • Interpolation discussion....
$Id: minutes-2009-04-27.html,v 1.3 2009/04/28 14:53:15 jolien Exp $